The modulus reduction components reduced in proportion to the rise in phase displacement, and a higher sand stratum thickness yielded a bigger modulus reduction issue for upper pile segments (see Figure three and Determine 11a). In distinction, the envisioned behaviours with the reduce and Center segments presented outcomes which has https://andresgdyvr.theobloggers.com/37859413/drilled-pile-foundations-bd-can-be-fun-for-anyone