Three. Just after rig positioning, generate the casing into the ground. Drive steel casing into a minimum a depth of 1 m down below the ground amount to acquire lateral loads and actions at web site. The metal casing also battle problems resulting from groundwater during piling. The withdrawn tube https://castinsitupilesinbanglade62651.blogdon.net/everything-about-cast-in-situ-piles-in-bangladesh-48673311