1

Penmann Ltd finalises specialist HVAC installation for Nutricia’s production facility in Liverpool in line with FSI Phase 1 and 2

News Discuss 
Penmann recently finalised a complex HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system engineered to meet stringent hygiene and production requirements. The contract included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based on https://gorillasocialwork.com/story24846903/penmann-ltd-finalises-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-supporting-fsi-phase-1-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story